需安裝臨邊防護(hù)欄的場(chǎng)合有哪些?
來(lái)源:http://shhkjs.cn/ 發(fā)布時(shí)間:2022-09-15
為了保證施工人員的,在建筑施工臨邊場(chǎng)合中,需設(shè)置專門的防護(hù)設(shè)施---臨邊防護(hù)欄。那么哪些地方需要安裝臨邊護(hù)欄?小編為您講講。
In order to ensure the safety of construction personnel, special protective facilities --- edge guard fence shall be set up at the edge of construction. So where do we need to install edge guardrails? A small editor will tell you.
需安裝臨邊防護(hù)欄的場(chǎng)合:
Circumstances where edge guard rails need to be installed:
1、在基坑周邊、未安裝護(hù)欄的陽(yáng)臺(tái)、料臺(tái)、雨棚、挑平臺(tái)周邊、無(wú)外腳手架的屋面、樓層周邊及水箱周邊等,都需要安裝臨邊防護(hù)欄。
1. Edge guard rails shall be installed around the foundation pit, balcony without guardrail, material platform, canopy, cantilever platform, roof without external scaffold, floor and water tank.
2、在分層施工的樓梯口與梯段邊,都需要安裝臨邊防護(hù)欄,的樓梯口也應(yīng)在施工臨近時(shí)安裝正式的防護(hù)欄桿。
2. The edge guard rails shall be installed at the stairway entrances and stairways of layered construction, and the formal guard rails shall also be installed at the stairway entrances on the top floor when the construction is near.
3、在施工電梯、井架、腳手架以及建筑物通道的兩側(cè)邊,都需要安裝臨邊防護(hù)欄,地面通道上部要加設(shè)防護(hù)棚,注意雙籠井架通道中間應(yīng)采用分隔封閉的方式。
3. Side guard rails shall be installed on both sides of the construction elevator, derrick, scaffold and building passage, and safety protection shed shall be added on the upper part of the ground passage. Note that the middle of the double cage derrick passage shall be separated and closed.
4、在各種垂直運(yùn)輸接料平臺(tái)中,除兩側(cè)需要安裝防護(hù)欄以外,平臺(tái)口還應(yīng)設(shè)置防護(hù)門或可活動(dòng)的防護(hù)欄。
4. In all kinds of vertical transportation and receiving platforms, in addition to the need to install guard rails on both sides, the platform mouth should also be equipped with safety doors or movable guard rails.
臨邊防護(hù)欄使用要求:
Requirements for use of edge protection fence:
一、臨邊防護(hù)欄需采用工具化和定型化,規(guī)格尺寸以及連接方式應(yīng)符合相關(guān)要求。
1、 The edge guard rails shall be toolized and stereotyped, and the specifications, dimensions and connection methods shall meet relevant requirements.
二、防護(hù)欄由上下橫桿、邊框以及內(nèi)豎管或網(wǎng)片焊接而成,上桿離地1.1-1.2m,下桿離地0.5-0.6m,當(dāng)橫桿長(zhǎng)度達(dá)到2m以上時(shí),需要加設(shè)專用立柱。
2、 The protective fence is welded by upper and lower cross bars, frames and inner vertical pipes or meshes. The upper bar is 1.1-1.2m above the ground, and the lower bar is 0.5-0.6m above the ground. When the length of the cross bar reaches more than 2m, special columns need to be added.
三、防護(hù)欄需自上而下加設(shè)密網(wǎng)封閉,在欄桿下部應(yīng)設(shè)置高度18cm以上的擋腳板,擋腳板刷紅白或黑黃相間的條形警示漆。
3、 The protective fence shall be sealed with a safety net from top to bottom. A toe board with a height of more than 18cm shall be set at the lower part of the fence. The toe board shall be painted with red white or black yellow strip warning paint.
四、防護(hù)欄安裝固定需牢固,欄面與橫桿的連接應(yīng)能承受來(lái)自任何方向1000N的外力沖擊。等等。
4、 The protective fence shall be firmly installed and fixed, and the connection between the fence surface and the crossbar shall be able to withstand 1000N external force impact from any direction. wait.
臨邊護(hù)欄不僅僅只是對(duì)于建筑工地施工的硬性規(guī)定,更是保證施工的必要設(shè)施。所以它的生產(chǎn)質(zhì)量以及安裝方式需嚴(yán)格按照要求實(shí)施,這樣才能達(dá)到大化防護(hù)的效果。關(guān)注我們http://shhkjs.cn,了解更多事項(xiàng)!
The edge guardrail is not only a national mandatory provision for construction site construction, but also a necessary facility to ensure safe construction. Therefore, its production quality and installation method should be strictly implemented according to the requirements, so as to achieve greater safety protection effect. Follow us http://shhkjs.cn , learn more!